EV charging stalls in a Santa Ana condominium parking structure
Condos, Apartments & HOAs

Multi-Family and HOA EV Charging in Santa Ana

Condo, apartment, and HOA charging solved for communities across Santa Ana, Tustin, and the South Coast Metro area.

  • Licensed C-10 & Insured
  • Flat-Rate Pricing
  • Load-Shared and Submetered Configurations
  • SCE Multi-Family Incentive Paperwork Handled

Shared Buildings, Shared Capacity, Fair Billing

Multi-family and HOA EV charging in Santa Ana is rarely blocked by the electrical work. It is blocked by two questions the board has to answer first: where the capacity comes from, and who pays for the electricity. Santa Ana EV Charger builds proposals that answer both before a board vote, because a technically perfect plan that leaves billing ambiguous will not pass. California law now limits how much an association can obstruct a resident's request to install charging at their own stall, which means these conversations are happening in communities across Orange County whether the board has prepared for them or not. We handle the load assessment on the shared service, design a load-shared or separately metered configuration depending on how you want costs allocated, and present the options in language a board of non-electricians can actually evaluate. The result is a bank of stalls that works today and has a defined path for adding more.

What a Multi-Family Charging Project Covers

Scope is built around how your community wants costs allocated, not around a single fixed package.

  • Assessment of the shared house service

    We evaluate the common-area service and panel schedule to establish how much capacity is genuinely available for charging without touching individual unit meters.

  • Load-shared bank design

    Load sharing lets a group of stations divide the available current dynamically, so eight stalls can operate on a feeder that could never support eight units at simultaneous full output. This is usually what makes the project affordable.

  • Separate metering or submetering per stall

    Where residents must pay for their own consumption, we install submetering or configure the network's per-user billing so each stall's usage is attributed correctly and no cost lands on the association's common bill by accident.

  • Dedicated-circuit installs from an individual unit's meter

    When a single resident is installing at their own assigned stall under their own meter, we run that circuit from their panel, which keeps the cost and the electricity entirely theirs.

  • Conduit routing through parking structures

    Subterranean and podium garages require surface-mounted raceway routed to satisfy both the fire code and the association's aesthetic expectations. We plan the routing before quoting, not during install.

  • Trenching for surface lots

    Uncovered resident and guest parking gets trenched conduit runs with pull boxes and full surface restoration.

  • Expansion capacity built into the first phase

    Conduit, pull boxes, and distribution equipment are sized so adding stalls later is a pull-and-terminate job rather than a second construction project.

  • Board-ready written proposal

    You receive a document a board can circulate: scope, options, flat pricing, billing structure, and the maintenance responsibilities each party carries.

  • Attendance at a board or HOA meeting

    We will present the options in person and answer resident questions directly, which consistently moves approval faster than a document alone.

  • Permits, inspection, and incentive paperwork

    Filed under our C-10 license, inspected through the City of Santa Ana, and documented for Southern California Edison's multi-family charging incentives, which are among the strongest available.

From Board Question to Working Stalls

  1. 01

    Capacity Study and Options Package

    We assess the shared service and the parking layout, then build two or three viable configurations with flat pricing for each: typically a load-shared common bank, a separately metered arrangement, and a single-stall dedicated install. Each option states clearly who pays for the power and who maintains the equipment.

  2. 02

    Board Approval and Permitting

    You circulate the package and we attend the meeting if that helps. Once a configuration is approved we pull the City of Santa Ana permit and open the Southern California Edison incentive application, which for multi-family projects can meaningfully change the net cost.

  3. 03

    Installation in Phases

    Work is phased so resident parking stays available. Conduit and distribution equipment go in first, then stations, then commissioning: load-sharing groups configured, metering or per-user billing verified, and a live session run at each stall. Residents receive access instructions and the association receives the admin credentials.

Why Boards in Orange County Choose Us

  • We Answer the Billing Question First

    Every multi-family project we have seen stall did so over cost allocation, not electrical design. Our proposals lead with who pays for what, in writing, which is what lets a board actually vote instead of tabling the item again.

  • Load Sharing Instead of a Service Upgrade

    Associations are frequently told the only path is an expensive service upgrade. In most Orange County communities a load-shared configuration delivers the same usable charging on existing capacity. We model both so the board sees the real comparison.

  • Phase One Built for Phase Two

    Demand for stalls only grows. We size conduit and distribution for the community you will be in a few years from now, so the second phase is a short job rather than a repeat of the first.

Bring EV Charging to Your Santa Ana Community

Resident requests for charging are increasing and California law limits how long an association can defer them. Having a capacity study and a costed proposal in hand turns a contentious agenda item into a straightforward vote. Call to schedule an assessment of your property.